NEW QUESTION # 48
Your customer accounts revenue based on, product class category. Because all your customer's projects are funded by private and government institutions, they decide to classify all projects based on their funding source to accurately report on revenue in General Ledger. Accordingly, you create a new class category
"Funding Source" and assign it to all projects. However, you notice that the accounting is still happening based on product class category. Identify the reason for this problem. (Choose the best answer.)
- A. Funding source class category is assigned to all project types.
- B. Funding source class category is enabled for "available as accounting source".
- C. Funding source class category is not enabled for "available as accounting source".
- D. Product class category is not enabled for "available as accounting source".
Answer: C
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-foundation- configuration-define-types-and-categorizations.html#OAPFM222700 Topic - Manage Project Class Categories Setting Up Class Categories: Points to Consider Available as Accounting Source This option indicates if the class category is available as an accounting source so that Oracle Fusion Subledger Accounting can use the category to create mapping sets, account rules, journal line rules, and description rules.
Only one class category at a time is available as an accounting source in Oracle Fusion Subledger Accounting.
To change the class category that Oracle Fusion Subledger Accounting uses, deactivate the old class category and create a new one with a different date range.
NEW QUESTION # 49
Which three tasks can be performed using the project requirements work area? (Choose three.)
- A. creating issues for the backlog items.
- B. tracking backlog item status from the requirement storyboard.
- C. adding scrum master to backlog items.
- D. creating projects and tasks in the context of backlog items.
- E. creating change orders for the backlog items.
Answer: A,B,D
Explanation:
The project requirements work area is a work area that allows you to define and manage requirements for your projects using various methods and sources. Requirements are statements of needs or expectations that must be met by the project outcome. Backlog items are a type of requirement that are used for agile projects that follow an iterative and incremental approach. Three of the tasks that can be performed using the project requirements work area are:
* creating projects and tasks in the context of backlog items: This task allows you to create new projects and tasks or link existing projects and tasks to backlog items. This helps you to plan and execute the work that is required to fulfill the backlog items.
* creating issues for the backlog items: This task allows you to create new issues or link existing issues to backlog items. Issues are problems or risks that affect the progress or outcome of a project or requirement. This helps you to track and resolve the issues that are related to the backlog items.
* tracking backlog item status from the requirement storyboard: This task allows you to view and update the status of backlog items from the requirement storyboard. The requirement storyboard is a graphical representation of the progress and completion of backlog items using various stages and lanes. This helps you to monitor and control the delivery of backlog items. Adding scrum master to backlog items and creating change orders for the backlog items are not tasks that can be performed using the project requirements work area. Adding scrum master to backlog items is a task that can be performed using the project team work area, as scrum master is a role that is assigned to a project team member who facilitates and coordinates the agile project activities. Creating change orders for the backlog items is a task that can be performed using the project change management work area, as change orders are documents that capture and approve changes to a project scope, schedule, or budget. Reference:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-project- execution.html#OAPFM2356321
NEW QUESTION # 50
Where is the Allow Override option for the Default Capitalized Interest Rate Schedule specified?
- A. Manage Capitalized Interest Rates page
- B. Manage Expenditure Type page
- C. Manage Project Plan Type page
- D. Manage Capitalized Interest Rate Schedules page
- E. Manage Project Type page
Answer: E
Explanation:
The Allow Override option for the Default Capitalized Interest Rate Schedule is specified on the Manage Project Type page. This option allows you to override the default capitalized interest rate schedule for a project or task that uses the project type. The default capitalized interest rate schedule is used to calculate the capitalized interest amount for a project or task based on the interest rates and dates defined in the schedule.
Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-project- costs.html#OAPFM2356031
NEW QUESTION # 51
Which product offering simplifies the planning, budgeting, and forecasting capabilities as part of Project Management Cloud?
- A. Project Billing
- B. Enterprise Contract Management
- C. Project Costing
- D. Project Control
Answer: D
Explanation:
Project Control is the product offering that simplifies the planning, budgeting, and forecasting capabilities as part of Project Management Cloud. Project Control allows you to create and manage project plans, budgets, and forecasts using various methods and sources. You can also monitor and control project performance and variances using dashboards and reports. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio- management/20c/oapfm/manage-project-plans.html#OAPFM2356061
NEW QUESTION # 52
Your company creates a separate project for infrastructure services, so as to track these costs separately and then allocate to various projects that use the services of the infrastructure team. You want to allocate these costs by first attributing a fixed percentage of the source amount to each project and then spread it across tasks based on the actual labor hours charged to each task.
Which allocation basis method would you use to meet this requirement? (Choose the best answer.)
- A. target percentage and spread evenly
- B. spread evenly
- C. target percentage and prorate
- D. prorate
Answer: C
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapjc/allocate-project-costs.
html#OAPJC94831
* Spread Evenly
* The allocation rule divides the source pool amount equally among all the chargeable target tasks included in the rule. This is the most simple and direct basis method.
* Target Percentage and Spread Evenly
* Specify the percentage of the source pool that is required to allocate to each target line. The total specified target percentage must always equal 100 percent. The allocation rule calculates the amount to allocate to the target line, and then spreads the results evenly among the chargeable tasks.
* Prorate
* The allocation generation uses the attributes defined in the allocation rule to derive the rate at which the source pool amount is apportioned among the target projects and tasks. For this basis method, the allocation rule uses the basis attributes to apportion the source amount among all the tasks defined by the rule. The Prorate basis method provides precise control over how the rule distributes the source pool.
* Target Percentage and Prorate
* The allocation rule first uses the target percentage to calculate the amount to allocate to the line, and then apportions the results among all the tasks. The Target Percentage and Prorate basis method provides precise control over how the rule distributes the source pool.
NEW QUESTION # 53
Your customer has implemented Oracle Project Portfolio Management Cloud recently and they have hired new employees for their Professions Services business. These employees are set up in Oracle Human Capital Management Cloud, but the Project Administrators are unable to add them as resources in the Planning Resource Breakdown Structure.
What are three conditions for new employees to show up in the list? (Choose three.)
- A. All new employees created as persons must have an active project role.
- B. All new employees created as persons must have an active assignment.
- C. All new employees created as persons must be assigned to a department.
- D. All new employees created as persons must have an active supervisor.
- E. Current date is before the effective date of the resource, and you did not enable the "Include people with future-dated effective start dates" option during the search.
Answer: B,C,E
NEW QUESTION # 54
Your organization has a requirement to send notifications to the owners of the associated tasks when the status of a deliverable is set to Complete. You have been asked to evaluate generate public events for project deliverable status changes feature to manage this requirement.
Which two statements are true about this feature? (Choose two.)
- A. The public event is not generated when the priority of a deliverable changes.
- B. The public event is not generated when a deliverable is created or deleted.
- C. The public event is generated when a deliverable is created or deleted.
- D. The public event is generated when the progress status for a deliverable changes.
Answer: B,D
Explanation:
The generate public events for project deliverable status changes feature is a feature that allows you to send notifications or trigger actions when the progress status of a deliverable changes from one value to another.
For example, when the status of a deliverable is set to Complete, you can send a notification to the owners of the associated tasks or update the status of the tasks accordingly. Two statements that are true about this feature are:
* The public event is not generated when a deliverable is created or deleted. This feature only generates events when the progress status of a deliverable changes, not when a deliverable is added or removed from a project or task.
* The public event is generated when the progress status for a deliverable changes. This feature generates events when the progress status of a deliverable changes from one value to another, such as from Not Started to In Progress, or from In Progress to Complete. You can define rules and actions for each progress status change using Business Process Management (BPM) Worklist. The public event is also not generated when the priority of a deliverable changes, as this feature only generates events when the progress status of a deliverable changes. Reference: https://docs.oracle.com/en/cloud/saas/project- portfolio-management/20c/oapfm/manage-project-execution.html#OAPFM2356211
NEW QUESTION # 55
Your customer complains that their project resources do not report their time promptly, which has resulted in incorrect reporting of project performance. What should you do to fix this problem? (Choose the best answer.)
- A. Enable track missing time at project template.
- B. Enable track missing time at project type.
- C. Enable track missing time at project unit.
- D. Enable track missing time at business unit.
Answer: C
Explanation:
To fix the problem of project resources not reporting their time promptly, you should enable track missing time at project unit. This option allows you to track and report on missing time entries for project resources based on their work assignments and schedules. You can also set up notifications and reminders to prompt resources to enter their time on a regular basis. Reference: https://docs.oracle.com/en/cloud/saas/project- portfolio-management/20c/oapfm/manage-project-time-and-labor.html#OAPFM2356011
NEW QUESTION # 56
You create a contract with two contract lines: Line 1 and Line 2. You create separate bill plans: A for contract Line 1 and B contract for Line 2, with a different bill set number (11 for Bill Plan A and 22 for Bill Plan B).
Then Bill Plan A is allocated against Project X - Task 10, and Bill Plan B is allocated against Project Y - Task 30.
Based on the preceding setup, you are generating invoices. Identify two correct statements about invoice generation in this scenario. (Choose two.)
- A. Two invoices are created using the same contract.
- B. Bill set number drives the grouping of transactions.
- C. Invoice generation does not depend on bill plan. The invoices are created based on the contract line.
- D. Both the contract lines create only a single invoice because they are using the same contract.
Answer: A,B
Explanation:
Ref: https://docs.oracle.com/cd/E51367_01/projectop_gs/OAPJB/F1087456AN1006D.htm What's a bill set?
Transactions originating from different bill plans with the same bill set number on a contract are included on the same invoice. If a contract has multiple bill plans and each have different values for the bill set, Oracle Fusion Project Billing creates a separate invoice for each bill plan
NEW QUESTION # 57
You configure one OTBI using Project Cross Subject Area Analysis Real Time. You notice that all measures (Budget, Forecast, Cost, Commitments, Revenue, and Invoice) are not available for Bill-To-Customer and Contract and Contract Line dimensions. Identify the reason for this behavior. (Choose the best answer.)
- A. The Bill-To-Customer dimension applies only to Revenue and Invoice measures.
- B. The Bill-To-Customer dimension does not apply to Invoice measures, but the Contract and Contract Line dimensions apply only to Revenue and Invoice measures.
- C. The Bill-To-Customer dimension applies to Invoice measures, and the Contract and Contract Line dimensions apply to Revenue and Invoice measures.
- D. The Bill-To-Customer dimension applies only to Invoice measures, but the Contract and Contract Line dimensions do not apply to Revenue and Invoice measures.
- E. The Contract and Contract Line dimensions apply only to Invoice measures.
Answer: C
Explanation:
Ref:https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/faopm/subjectareas.
html#Projects__Cross_Subject_Area_Analysis__Real_Time_SA_20
Analyze real-time information on project performance, including budgets, forecasts, costs, commitments, revenue, and invoices.
This subject area analysis allows cross subject area analysis between Funding, Invoices, Revenue, Budget, forecasts, Costs areas.
NEW QUESTION # 58
Your customer wants additional project information for detailed account balance maintenance, reconciliation, and reporting. Identify the configuration in subledger accounting that can be set up to fulfill this requirement.
(Choose the best answer.)
- A. Accounting Method
- B. Accounting Rule
- C. Journal Rules
- D. Supporting References
- E. Mapping Sets
Answer: D
Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPFM/OAPFM1125357.htm#OAPFM1125357 Assignment of Supporting References Supporting references may be used to capture transaction values on journal entry lines. A supporting reference can be used on a journal entry rule set only if it's assigned a source from the event class of the journal entry rule set.
Creating Supporting References: Explained
Supporting references are used to store additional source information about a subledger journal entry at the line level.
Supporting references with balances establish subledger balances for a particular source and account for a particular combination of supporting references plus the account combination.
For example:
* If a journal line contains a supporting reference that includes two sources, Customer Type and Customer Name.
* Balances are created for the account combination, plus customer name and customer type.
Examples of how you may want to use supporting reference balances are to:
* Facilitate reconciliation back to the subledgers and source systems by tagging journal entries with transaction and reference attributes.
* Create balances by dimensions not captured in the chart of accounts.
* Reporting using dimensions not captured in the chart of accounts.
* Enrich Oracle Fusion Business Intelligence Applications reporting on subledger journals.
* Profit and loss balances by dimensions not captured in the chart of accounts Define supporting references to hold additional supporting information for detailed account balance maintenance or reconciliation and reporting requirements.
NEW QUESTION # 59
While opening an organization tree on the Manage Organization Trees page, you notice that the hierarchy status is displayed as Inactive. Identify the two reasons for the organization tree to be in Inactive status. ( Choose two.)
- A. You used Create Tree Version in the action menu.
- B. You selected the Edit icon for opening the hierarchy.
- C. You used Create Tree in the action menu.
- D. You used View Tree Version in the action menu.
- E. You opened the hierarchy by clicking the name.
Answer: A,C
Explanation:
When you use Create Tree or Create Tree Version in the action menu, you create a new organization tree or a new version of an existing tree, respectively. These actions result in an Inactive status for the organization tree, until you activate it. When you use View Tree Version or select the Edit icon or click the name of the tree, you open an existing organization tree that has an Active status. Reference: https://docs.oracle.com/en
/cloud/saas/project-portfolio-management/20c/oapfm/manage-project-organizations.html#OAPFM2355921
NEW QUESTION # 60
Your organization has decided to enable the common accounting and project accounting periods option while defining business unit implementation options.
Where will you maintain the accounting period statuses if this option has been enabled?
- A. Project Foundation
- B. Project Costing
- C. Subledger Accounting
- D. General Ledger
Answer: A
NEW QUESTION # 61
You have been asked to set up one active person, who is not a team member in the project, as a quality manager for each quality task created under projects. However, when you try to assign the quality manager as Task Manager, you cannot find the person's name in the list of values. What is the reason for this problem?
(Choose the best answer.)
- A. The "Require Task Managers to be Project Team Members" profile option is set to No.
- B. The "Require Task Managers to be Project Team Members" profile option is set to Yes.
- C. The quality manager belongs to a department that is not associated with the project.
- D. The quality manager is not assigned with a supervisor.
Answer: B
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/fapfm/introducing-oracle- project-portfolio-management-cloud-services.html#FAPFM428138 Topic - Project Foundation Profile Options Profile Option Name - Task Managers Must Be Project Team Members Description - Specify whether task managers must be project team members.
Values - No (Default) / Yes
Setup Task Name - Require Task Managers to be Project Team Members
NEW QUESTION # 62
Which two statements are true about a project in "Draft" status? (Choose two.)
- A. Project managers can view draft projects on the Project Manager Dashboard and use the projects for requirements planning.
- B. Project managers can neither view draft projects on the Project Manager Dashboard nor use the projects for requirements planning.
- C. Team members cannot see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
- D. Team members can see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
Answer: A,C
Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPEM/OAPEM1122096.htm The following table lists the project statuses and what you can do with projects in that status.
Project Status
What you can do?
Draft
* Project managers can view draft projects in the Project Manager Dashboard and use the projects for requirements planning.
* Team members can't see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
Active
* Project managers can view active projects in the Project Manager Dashboard and use the projects for requirements planning, project execution, and reporting.
* Team members can view task assignments on active projects on the Team Member Dashboard and My Work area.
Pending Close
* Project managers can view pending projects in the Project Manager Dashboard and use the projects for project tracking, and reporting.
* Team members can view task assignments on pending projects on the Team Member Dashboard and My Work area.
Submitted
* Project managers can view submitted projects in the Project Manager Dashboard and use the projects for project tracking, and reporting.
* Team members can view task assignments on submitted projects on the Team Member Dashboard and My Work area Closed
* Project managers can't view closed projects in the Project Manager Dashboard or use the projects for requirements planning, project execution, and reporting.
* Team members can't view tasks of closed projects on the Team Member Dashboard or in the My Work area.
NEW QUESTION # 63
Which three features are part of Oracle Fusion Functional Setup Manager?
- A. feature opt-in for a best fit configuration
- B. guided task list for end-to-end setup requirements
- C. export and import services for setup data migration between environments
- D. modifying an existing implementation project task list by selecting more functional areas when needed
- E. updating an implementation project task list by changing the opt-in configuration to suit the latest requirements
Answer: A,B,C
Explanation:
https://docs.oracle.com/en/cloud/saas/applications-common/r13-update17d/oafsm/applications-cloud-using-functional-setup-manager.pdf Functional Setup Manager offers the following:
* Standardized application configuration and setup experience
* Feature opt-in for a best fit configuration
* Flexible processes for managing setup:
# Setup by functional areas for an adopt-as-you-go approach
# Implementation projects to manage setup
# Upload file to enter setup data in bulk
* Guided task list for end-to-end setup requirements
* Export and import services for setup data migration between environments
* Comprehensive reporting on setup data
NEW QUESTION # 64
You are managing a project based on a Waterfall model. You define a project and a project plan in Oracle Project Management with tasks and subtasks applicable to each of the phases of the project: Initiation, Discovery, Design, Build, Test, and Deploy. As a project manager, you want to define deliverables for your project requirements that are elucidated during the Discovery phase of your project. You now want to understand how the inheritance between requirements, tasks, and deliverables works.
Which two are correct statements in this scenario? (Choose two.)
- A. The association of a deliverable with a task is dependent on associating a requirement with a task.
- B. A deliverable associated with a requirement is automatically associated with the tasks created for that requirement.
- C. A deliverable associated with a requirement is not automatically associated with the tasks created for that requirement.
- D. You associate a deliverable with a task independent of associating a requirement with a task.
Answer: C,D
Explanation:
According to Oracle sources1, the inheritance between requirements, tasks, and deliverables works as follows:
* You can associate a deliverable with a task independent of associating a requirement with a task. You can also associate a deliverable with a requirement independent of associating a task with a requirement
1.
* A deliverable associated with a requirement is not automatically associated with the tasks created for that requirement. You must manually associate the deliverable with the tasks that produce it1.
Therefore, the correct answer is B and D.
1: Can deliverables for projects and tasks be inherited from associated requirements? - docs.oracle.com (index
1)
In Oracle Project Management, you can define requirements, tasks, and deliverables for your project based on your project methodology and lifecycle. Requirements are statements of needs or expectations that must be met by the project outcome. Tasks are units of work that must be performed to complete the project.
Deliverables are products or services that are produced or provided as part of a task or requirement. Two correct statements about how the inheritance between requirements, tasks, and deliverables works are:
* You associate a deliverable with a task independent of associating a requirement with a task. This means that you can create a deliverable for a task regardless of whether the task is linked to a requirement or not.
* A deliverable associated with a requirement is not automatically associated with the tasks created for that requirement. This means that you have to manually associate a deliverable with a task even if both the deliverable and the task are linked to the same requirement.
NEW QUESTION # 65
Which three file-based data imports are available for use in Oracle Project Portfolio Management Cloud?
- A. Capital Rate Schedule
- B. Project Tasks
- C. Project Billing Events
- D. Project Budgets
- E. Project Templates
Answer: B,C,D
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oefpp/toc.htm
NEW QUESTION # 66
A project administrator is trying to assign a team member for a project but cannot find the person in the team member list on the Project Definition page. What is the reason for this problem? (Choose the best answer.)
- A. The employee is not assigned to a department.
- B. Project roles are not assigned in the project.
- C. The employee is not assigned with a supervisor.
- D. The employee is not assigned to the project-owning organization.
Answer: A
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-foundation- configuration-define-project-resource-breakdown-structures.html#OAPFM180158_2 Why can't I find persons in the list of resources when I enter team members, planning resources, or person rate schedules?
You can't find persons in the list of resources when you enter team members, planning resources, or person rate schedules in the following situations:
* The administrator didn't assign a department while creating users. Persons must have an active assignment and be assigned to a department in Oracle Fusion Human Capital Management before they can be added as team members or entered as resources on the planning resource breakdown structure or person rate schedule.
* The resource isn't active in Oracle Fusion Human Capital Management because the current date is before the effective date of the resource. If you want to include persons who will start in the future, select the Include people with future-dated effective start dates option when you search for the person.
* Persons assigned as project managers aren't active as of the project start date.
* The assignment of the person is terminated, and an appropriate value isn't set for the number of days to display people with terminated assignments. You can set the profile value appropriately at the site profile level using the Specify Number of Days to Display People with Terminated Assignments task in the Setup and Maintenance work area.
NEW QUESTION # 67
Where should you specify the Default Capitalized Interest Rate Schedule?
- A. Manage Capitalized Interest Rates page
- B. Manage Expenditure Type page
- C. Manage Project Plan Type page
- D. Manage Capitalized Interest Rate Schedules page
- E. Manage Project Type page
Answer: E
Explanation:
The Default Capitalized Interest Rate Schedule should be specified on the Manage Project Type page. This option allows you to select a capitalized interest rate schedule that will be used as the default for projects or tasks that use the project type. A capitalized interest rate schedule defines the interest rates and dates that are used to calculate the capitalized interest amount for a project or task. Reference: https://docs.oracle.com/en
/cloud/saas/project-portfolio-management/20c/oapfm/manage-project-costs.html#OAPFM2356101
NEW QUESTION # 68
......