NEW QUESTION 25
Where does the data get pulled from during an extract migration in IBM App Connect Enterprise?

  • A. An existing Integration Server
  • B. Generated Project Interchange (PI) files
  • C. An IBM MQ queue manager
  • D. Deployed BAR files

Answer: A

 

NEW QUESTION 26

According to the API resource pictured above, there are three possible HTTP Return Codes: 400, 404, 200.
What is one way to set a HTTP Return code as 400 using ESQL?

  • A. SET OutputLocalEnvironment.REST.Reply.Transport.HTTP = 400;
  • B. SET OutputLocalEnvironment.Destination.HTTP.ReplyStatusCode = 400;
  • C. SET OutputLocalEnvironment.Reply.Transport.HTTP = 400;
  • D. SET OutputLocalEnvironment.ReplyStatusCode = 400;

Answer: B

 

NEW QUESTION 27
Which two external security providers can be configured in the security profiles in IBM App Connect Enterprise?

  • A. RADIUS
  • B. WS-Trustv1.3STS
  • C. OAuth 2.0
  • D. LDAP
  • E. Linux PAM

Answer: C,D

 

NEW QUESTION 28
What Event Coordination option must be implemented in the Collector node so that message collections are propagated in the order they have been completed?

  • A. Disabled
  • B. First complete collection
  • C. FIFO
  • D. All complete collections

Answer: D

 

NEW QUESTION 29
The image below is an example of which IBM App Connect Toolkit editor?

  • A. Message Definition
  • B. Graphical Data Mapping
  • C. Message Flow Editor
  • D. Policy Editor

Answer: B

 

NEW QUESTION 30
On distributed systems, where must the local queue manager be specified in globally coordinated transactions?

  • A. Message Flow
  • B. MQ Header
  • C. Integration Node
  • D. JMS Header

Answer: C

Explanation:
Explanation
https://www.ibm.com/support/knowledgecenter/en/SSMKHH_10.0.0/com.ibm.etools.mft.doc/ac04561_.htm

 

NEW QUESTION 31
Which file needs to exist in the directory where the command docker build run?

  • A. config.yaml
  • B. docker.yaml
  • C. Configfile
  • D. Dockerfile

Answer: D

 

NEW QUESTION 32
When splitting message flow processing between different integration servers how do the flows communicate?

  • A. Using node addresses and node configuration
  • B. Using a switch server and connectivity agents
  • C. Using switch addresses and node configuration
  • D. Using a connectivity server and switch agents

Answer: B

Explanation:
Explanation
If you are splitting processing between different integration servers, or between IBM App Connect Enterprise and IBM App Connect on IBM Cloud, your flows communicate by using a Switch server and connectivity agents.
https://www.ibm.com/support/knowledgecenter/SSTTDS_11.0.0/com.ibm.etools.mft.doc/cl23141_.htm

 

NEW QUESTION 33
In a message flow, what are two valid event sources of a monitoring event?

  • A. Transaction events
  • B. Mapping events
  • C. Terminal events
  • D. Failover events
  • E. Node events

Answer: A,C

Explanation:
Explanation
Event typesYou can configure a message flow to emit two types of events: transaction events and terminal events. There are three types of transaction events: start, end, and rollback. The transaction events are emitted only from input nodes such as MQInput and HTTPInput. Terminal events are emitted from any terminal of any node.
https://www.ibm.com/developerworks/websphere/library/techarticles/0911_fan/0911_fan.html

 

NEW QUESTION 34
What is the purpose of an Integration Node?

  • A. It provides an isolated runtime environment for a set of deployed message flows and resources.
  • B. It is a collection of processes to manage state of the deployed applications and libraries.
  • C. It provides a specific mode of operation or the availability of an additional product, such as a database.
  • D. It is a parent process which is responsible for looking after one or more associated runtime processes.

Answer: A

 

NEW QUESTION 35
When installing IBM App Connect Enterprise for a shared installation on Linux, which group do users needed to be added to in order to gain access to the platform?

  • A. mqbrkrs
  • B. mqnodeusers
  • C. mqusers
  • D. mqsiadmin

Answer: A

Explanation:
Explanation
https://www.ibm.com/support/knowledgecenter/SSTTDS_11.0.0/com.ibm.etools.mft.doc/bh25992_.htm

 

NEW QUESTION 36
What is the maximum number of integration servers that can be used in a single server running IBM App Connect Enterprise?

  • A. Unlimited
  • B. Up to 128
  • C. Up to 256
  • D. Up to 512

Answer: A

Explanation:
Explanation
https://www.ibm.com/support/knowledgecenter/SSTTDS_11.0.0/com.ibm.etools.mft.doc/bn28100_.html

 

NEW QUESTION 37
The message flow security manager can be invoked by configuring a security enabled input node. The following diagram shows an example message flow and gives an overview of the sequence of events that occur when an input message is received by a security enabled input node in the message flow. Select the number that would interact with LDAP.

Answer:

Explanation:

Explanation
4

 

NEW QUESTION 38
What command must be executed before running the mqsicreatebroker command on Linux to create an integration node?

  • A. mqsicommandconsole
  • B. mqsiservice
  • C. mqsiprofile
  • D. mqsicvp

Answer: C

Explanation:
Explanation
https://www.ibm.com/support/knowledgecenter/SSTTDS_11.0.0/com.ibm.etools.mft.doc/ae12720_.html

 

NEW QUESTION 39
What is a difference between using Convert Single Project and Convert Multiple Projects when converting from projects to applications and libraries?

  • A. Convert Single Project is for converting an existing project and any references into one application while Convert Multiple Projects will convert into multiple desired applications with shared libraries.
  • B. Only Convert Single Project can convert existing Message Broker projects into IBM App Connect Enterprise applications and libraries, Convert Multiple Projects requires the projects to meet IBM Integration Bus standards before converting.
  • C. Convert Single Project is for one existing project and Convert Multiple Projects is for one or more existing projects.
  • D. Convert Single Project will put all artifacts into one application or library, while Convert Multiple Projects will create a new application or library for each existing project.

Answer: B

 

NEW QUESTION 40
The mqsicommandconsole command is a required prerequisite for running which two commands?

  • A. mqsimanagelinlcs
  • B. mqsisetsecurity
  • C. mqsiAssemblylnstall
  • D. mqsiprofille
  • E. mqsichangeproperties

Answer: B,C

Explanation:
Explanation
The mqsicommandconsole command is required for the following commands:
* mqsiaddbrokerinstance
* mqsicreatebroker
* mqsimigratecomponents
* mqsisetsecurity
* mqsiAssemblyInstall
* mqsimanagexalinks
* mqsipackagebar
https://www.ibm.com/support/knowledgecenter/SSMKHH_9.0.0/com.ibm.etools.mft.doc/bn13550_.htm

 

NEW QUESTION 41
How can an MQGet node be configured to read a message from a queue without deleting it?

  • A. Check the "Browse Only" property
  • B. Set "Copy Message" property to None
  • C. Check the "Read Only" property
  • D. Set "Generate Mode" property to None

Answer: B

 

NEW QUESTION 42
Which section in the Cloud Integration Platform Navigator should be clicked in order to install IBM MQ?

Answer:

Explanation:

Explanation
Messages

 

NEW QUESTION 43
The message flow security manager can be invoked by configuring a security enabled input node. The following diagram shows an example message flow and gives an overview of the sequence of events that occur when an input message is received by a security enabled input node in the message flow. Select the number that would interact with LDAP.

Answer:

Explanation:

Explanation
4

 

NEW QUESTION 44
The following flow receives order messages on an MQInput node then uses a Compute node to do some processing and sends MQ messages to two warehouses on two different queues.

The compute node routes the message to two MQOutput nodes connected through terminals Out1 and Out using the following ESQL expressions.
PROPAGATE TO TERMINAL 'out1; RETURN TRUE;
After deploying the flow, the solution developer noticed that the second queue always receives an empty message. To fix this issue, which ESQL expression lines should be used in the Compute node instead?

  • A. PROPAGATE TO TERMINAL 'out1; PROPAGATE; RETURN FALSE;
  • B. PROPAGATE TO TERMINAL 'out1; DELETE NONE-RETURN TRUE;
  • C. RETURN TRUE DELETE NONE; RETURN TRUE;
  • D. PROPAGATE TO TERMINAL 'out; PROPAGATE TO TERMINAL 'out';

Answer: A

 

NEW QUESTION 45
......

C1000-056 Dumps Ensure Your Passing: https://www.exams4collection.com/C1000-056-latest-braindumps.html