NEW QUESTION 33
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. The repository is migrated in uptime
  • B. Dedicated application tables are migrated in uptime
  • C. TABIMJJPG is executed in uptime
  • D. An additional temporary database is used during uptime

Answer: B

 

NEW QUESTION 34
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.

  • A. DMO can only be run with systems NW740 or NW731
  • B. A
  • C. Target DB size will increase temporarily

Answer: A,C

 

NEW QUESTION 35
What are the benefits of using the Benchmarking option of the DMO for SUM?
There are 2 correct answers to this question.
Response:

  • A. You can verify that the content of the download directory matches the stack.XML file.
  • B. You can find the optimal number of parallel R31oad processes by monitoring host performance.
  • C. You can record the modification adjustment during migration and use the transports in the next runs.
  • D. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.

Answer: B,D

 

NEW QUESTION 36
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Downtime migration (EU_CLONE_MIG_DT_RUN)
  • B. Parallel distribution (PARDIST_SHD)
  • C. Uptime migration (EU_CLONE_MIG_UT_RUN)
  • D. Shadow repository creation (EU_IMPORT*)

Answer: C

 

NEW QUESTION 37
In ICNV. How database operations synchronized between the source and the target table?

  • A. Deletes are directly executed in the target table by delete trigger.
  • B. AA

Answer: A

 

NEW QUESTION 38
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

  • A. Activate the required business functions manually in the production system.
  • B. During conversion, SUM delivers some business functions already activated.
  • C. Import a transport request from the development system that contains the recording of the activation.
  • D. Specify the business functions that need to be switched on during the prepare part of SUM.

Answer: B,C

 

NEW QUESTION 39
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Activation of dictionary objects (ACT_UPG)
  • B. Switch to new repository (EU_SWITCH)
  • C. Conversion of application tables (PARCONVJJPG)
  • D. Modification adjustment (SPDD)

Answer: A,D

 

NEW QUESTION 40
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. TABIM_UPG is executed in uptime
  • B. The repository is migrated in uptime
  • C. Dedicated application tables are migrated in uptime
  • D. An additional temporary database is used during uptime

Answer: C

 

NEW QUESTION 41
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host agent determine the path to the SUM directory?

  • A. The path was stored in file sumabap.conf during registration
  • B. AA

Answer: A

 

NEW QUESTION 42

  • A. Kernel for target release, Linux, SAP HANA
  • B. Kernel for target release, Windows, SAP HANA
  • C. You are performing the corresponding maintenance transaction with the Maintenance Planner.
    Which kernels do you need to select for the SAP S/4HANA conversion?
    There are 2 correct answers to this question.
    Response:
  • D. Kernel for target release, Windows, SAP MaxDB
  • E. Kernel for source release, Windows, SAP MaxDB

Answer: B,C,E

 

NEW QUESTION 43
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:

  • A. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
  • B. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
  • C. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
  • D. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.

Answer: B

 

NEW QUESTION 44
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. Upgrading to SAP ECC 6.08 without using DMO
  • B. Using DMO when applying Support Packages to SAP ECC 6.07
  • C. Updating to SAP ECC 6.07 using DMO
  • D. SAP S/4HANA conversion to SAP S/4HANA 1709

Answer: A,D

 

NEW QUESTION 45
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:

  • A. The major SUM Guide
  • B. The SAP S/HANA Conversion Guide
  • C. The DMO Guide
  • D. The Application Guide

Answer: B,C

 

NEW QUESTION 46
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • D. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete

Answer: A

 

NEW QUESTION 47
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:

  • A. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
  • B. In the job log for the corresponding job in SM37 (Job Overview)
  • C. In the corresponding R3trans log files of this phase
  • D. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

Answer: A,B

 

NEW QUESTION 48
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities?
There are 3 correct answers to this question.
Response:

  • A. Perform an SAP S/4HANA conversion including DMO.
  • B. Use DMO for SUM.
  • C. Apply SAP Support Packages.
  • D. Upgrade the SAP system.
  • E. Apply an Enhancement Package.

Answer: C,D,E

 

NEW QUESTION 49
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for target release, Linux, SAP HANA
  • B. Kernel for target release, Windows, SAP HANA
  • C. Kernel for target release, Windows, SAP MaxDB
  • D. Kernel for source release, Windows, SAP MaxDB

Answer: B,D

 

NEW QUESTION 50
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
The source system is non-Unicode and the target database is a scale-out system.
What do you need to consider?
There are 2 correct answers to this question.

  • A. The target database size increases temporarily because of the Shadow Repository.
  • B. SAP HANA Landscape Reorganization requires a manual step to edit a file.
  • C. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • D. Network capacity between exporting and importing R31oad processes must be considered.

Answer: B,C

 

NEW QUESTION 51
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.

  • A. An SAP S/4HANA conversion is performed, without adapting the customer data.
  • B. An upgrade of the software components is performed, without changing the database type.
  • C. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
  • D. A change of the database type is performed, without changing the software components.

Answer: D

 

NEW QUESTION 52
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Dual Stack split
  • B. Homogenous system copy
  • C. Database migration
  • D. Release upgrade
  • E. Support Package Stack update

Answer: C,D,E

 

NEW QUESTION 53
......