[Q76-Q100] 1z0-1066-24 Actual Questions 100% Same Braindumps with Actual Exam!

Share

1z0-1066-24 Actual Questions 100% Same Braindumps with Actual Exam!

1z0-1066-24 Study Material, Preparation Guide and PDF Download

NEW QUESTION # 76
A customer would like to account for the production loss in the supply planning process using the item shrinkage rate planning specification.
Which statement reflects the system behavior to meet this requirement?

  • A. Planning calculation creates scrap demand to compensate for loss and maintains supply.
  • B. Planning calculation does not support shrinkage functionality.
  • C. Planning process reduces the demand based on shrinkage factor and keeps the supply quantity as is.
  • D. Planning calculates no additional demand but creates the additional required supply based on shrinkage factor.

Answer: A


NEW QUESTION # 77
Which statement is NOT true about item attributes?

  • A. The "forecast control" item attribute must be assigned if configure-to-order (CTO) items are being planned.
  • B. Supply plans ignore items with the "planning method" attribute set to MPP.
  • C. Many item attributes can be overridden as part of a simulation set that gets applied to a plan.
  • D. Some item attributes can be overridden directly in the Items table for simulation purposes.

Answer: B

Explanation:
The statement that "Supply plans ignore items with the 'planning method' attribute set to MPP" is incorrect. Items with this planning method are included as long as relevant configurations are active. All other statements are true, reflecting how item attributes interact with Oracle Planning Cloud functionalities MY ORACLE SUPPORT


NEW QUESTION # 78
Your client wants to create a supply plan that only considers sales order and disregards forecast demand within a specific demand horizon. What must you do to accomplish this?

  • A. Manage Plans > Search and select supply plan > Supply tab > General tab > Check Demand Time Fence Control
  • B. Manage Plans > Search and select supply plan > Supply tab > Organizations and Schedules tab > Remove all demand schedules
  • C. Manage Plans > Search and select demand plan > Demand tab > General tab > Check Demand Time Fence Control
  • D. Manage Plans > Search and select demand plan > Demand tab > General tab > Select 'Do no spread forecast'
  • E. Manage Plans > Search and select supply plan > Supply tab > General tab > Advanced Options > Check 'Create time fence'

Answer: A


NEW QUESTION # 79
You just ran a Data Collection and want to confirm that certain data was successfully collected. Identify three collected data sets that can be viewed on the Maintain Supply Network Model Page. (Choose three.)

  • A. Customers and Customer Sites
  • B. Safety Stock and Subinventories
  • C. Calendar and Master Organization
  • D. Customer Location and Carriers
  • E. Supplier Site and Service Level

Answer: C,D,E


NEW QUESTION # 80
Which statement is correct regarding S&OP?

  • A. S&OP supply requirements are based on Bills of Resources (BOR) if available; otherwise, the Work Definitions are used.
  • B. Sourcing cannot be maintained directly in S&OP, but must be collected.
  • C. S&OP supply requirements are only based on Bills of Resources (BOR).
  • D. If Bills of Resources are used, the only way to make one available is via import using a dedicated template.

Answer: A

Explanation:
In Sales and Operations Planning (S&OP), supply requirements are primarily based on Bills of Resources (BOR) when available, and Work Definitions serve as a fallback option when BOR is not present. This flexibility enables S&OP to utilize the most specific resource information for planning without limiting sourcing data to imported templates only​ NAVIGATE YOUR NEXT
.


NEW QUESTION # 81
Your client has made a change to item costs. What type of collection do they need to run to only pick up this change?

  • A. Item costs cannot be updated via a data collection processes.
  • B. Must run full data collection. It is not possible to update just item costs.
  • C. Item costs is automatically updated. No data collection is necessary.
  • D. Run targeted collection for item costs.
  • E. Run net change collection for item costs.

Answer: D


NEW QUESTION # 82
Which statement is NOT true about item attributes?

  • A. The "forecast control" item attribute must be assigned if configure-to-order (CTO) items are being planned.
  • B. Supply plans ignore items with the "planning method" attribute set to MPP.
  • C. Many item attributes can be overridden as part of a simulation set that gets applied to a plan.
  • D. Some item attributes can be overridden directly in the Items table for simulation purposes.

Answer: B

Explanation:
The statement that "Supply plans ignore items with the 'planning method' attribute set to MPP" is incorrect. Items with different planning methods, such as MPP (Material Planning Process), are factored into supply plans as long as the corresponding configurations are active. The other statements reflect accurate information about item attributes and their behavior in Oracle Cloud planning processes​
​
MY ORACLE SUPPORT
.


NEW QUESTION # 83
What does the Advanced Plan Option check box "Consider currency conversion rates to plan revenue" do?

  • A. It enables backlog plans to prioritize constrained products based on higher price and to consider exchange rates.
  • B. It enables supply plans with planning method constrained to prioritize constrained products based on higher price and to consider exchange rates.
  • C. For supply and sales and operations plans, it enables prioritization of constrained products based on higher price and to consider exchange rates.
  • D. It enables sales and operations plans with constrained products to prioritize products based on higher price and to consider exchange rates.

Answer: C

Explanation:
The "Consider currency conversion rates to plan revenue" option allows both supply and sales and operations plans to factor in currency conversion rates. This enables prioritization based on product pricing in different currencies, which is particularly useful in multinational operations where pricing and revenue planning depend on exchange rate variations


NEW QUESTION # 84
Which statement is NOT true about item attributes?

  • A. The "forecast control" item attribute must be assigned if configure-to-order (CTO) items are being planned.
  • B. Supply plans ignore items with the "planning method" attribute set to MPP.
  • C. Many item attributes can be overridden as part of a simulation set that gets applied to a plan.
  • D. Some item attributes can be overridden directly in the Items table for simulation purposes.

Answer: B

Explanation:
The statement that "Supply plans ignore items with the 'planning method' attribute set to MPP" is incorrect. Items with this planning method are included as long as relevant configurations are active. All other statements are true, reflecting how item attributes interact with Oracle Planning Cloud functionalities​
​
MY ORACLE SUPPORT
.


NEW QUESTION # 85
Your company needs to implement project-driven supply planning, along with demand and supply netting based on the country of origin. Which setup task is needed for this?

  • A. Manage Demand and Supply Netting Rules task
  • B. Manage Project Netting Rules task
  • C. Manage Attribute-Based Netting Rules task
  • D. Manage Attribute and Project Netting Rules task

Answer: D

Explanation:
To implement project-driven supply planning with demand and supply netting based on attributes such as country of origin, the "Manage Attribute and Project Netting Rules" task is necessary. This task allows combining attribute-based and project-specific criteria to meet complex planning requirements​
.


NEW QUESTION # 86
Your customer wants to be able to manually change the input values in purchase orders and transfer orders for the suggested plan recommendations. Which two recommendations are released by supply chain planning to Oracle Supply Chain Orchestration Cloud? (Choose two.)

  • A. Reschedules of sales orders, make, and buy
  • B. Schedule planned orders for make, buy, and transfer of supplies
  • C. Reschedules of existing make, buy, and transfer supplies
  • D. New planned orders for make, buy, and transfer of supplies

Answer: C,D


NEW QUESTION # 87
You are running a demand plan for the first time and you want to generate forecast for the next six months. Which two demand plans run options should be selected? (Choose two.)

  • A. Under data refresh options, select "Refresh with current data."
  • B. Under data refresh options, select "Refresh with demand planning data."
  • C. Select forecast shipments as forecast profiles.
  • D. Select sales orders as forecast profile.
  • E. Under data refresh options, select "Refresh with selected current data" and chose sales orders.

Answer: A,D


NEW QUESTION # 88
What happens when a demand planner approves a demand plan and then adjusts shipment history and runs demand plan again?

  • A. The approve action takes the data from the two final forecast measures and copies to Approved Final Shipments Forecast and Approved Final Bookings Forecast, respectively. After a forecast is approved, the approved values remain unchanged until the forecast is approved again.
  • B. The approve action makes the Adjusted Shipments Forecast and Adjusted Bookings Forecast measures "not editable." But any subsequent demand plan run can change Final Shipments Forecast and Final Bookings Forecast values.
  • C. The approve action takes the data from the two final forecast measures and copies to Approved Final Shipments Forecast and Approved Final Bookings Forecast, respectively. Any subsequent demand plan run can change final shipments or bookings forecast values that will automatically update the approved forecast measures.
  • D. The approve action makes the Adjusted Shipments Forecast and Adjusted Bookings Forecast measures "not editable." After a forecast is approved, the Final Shipments Forecast and Final Bookings Forecast measures remain unchanged until the forecast is approved again.

Answer: A


NEW QUESTION # 89
Which type of data in the Supply Network Model is not collected, but is accessed through a view used by Planning?

  • A. Carrier data
  • B. Organization data
  • C. Supplier data
  • D. Customer data

Answer: A

Explanation:
Carrier data in Oracle's Supply Network Model is typically accessed through views rather than being collected directly, which allows the system to reference this data without storing it redundantly. Other types, such as Supplier, Customer, and Organization data, are usually collected as they are directly relevant to supply chain execution​
​
NAVIGATE YOUR NEXT
.


NEW QUESTION # 90
You are a demand planner and you want to generate forecast for all laptop and desktop products in the US business unit. You are using standard enterprise and product hierarchy. You have created a demand plan and now you must define plan scope.
Identify three valid steps. (Choose three.)

  • A. For plan parameters, select forecasting calendar as Gregorian and time level as month.
  • B. For forecasting items, select hierarchy as product, level as category level 1, and laptop and desktop categories as level members.
  • C. For plan organizations, select hierarchy as enterprise, level as country, and US as level member.
  • D. For plan organizations, select hierarchy as enterprise, level as business unit, and US and level member.
  • E. For plan parameters, select forecasting calendar as Gregorian and time level as week.
  • F. For forecasting items, select hierarchy as product, level as product, and all laptop and desktop products as level members.

Answer: B,C,E

Explanation:


NEW QUESTION # 91
Your Procurement Department is getting ready to set up Approved Supplier Lists that will be needed for Supply Planning. They ask you for what you need on the ASLs for planning usage. Which three options are key for planning? (Choose three.)

  • A. Make sure to include Minimum Order Quantities.
  • B. Make sure to include Maximum Order Quantities.
  • C. Make sure they are at a Global level.
  • D. Make sure to include Fixed Order Quantities.
  • E. Make sure to include Fixed Lot Multipliers.
  • F. Make sure all Local level ASLs include an Organization.

Answer: A,C,E


NEW QUESTION # 92
Which statement fully describes the contents and purpose of the Product Lifecycle Management (PLM) page layout?

  • A. The PLM layout has two tables: one to define and manage launch dates for new products, and another for entering forecast adjustments.
  • B. The PLM layout has one table to define and manage launch and discontinuation dates, and another for entering forecast adjustments.
  • C. The PLM layout has one table to define and manage discontinuation dates, and another table for entering forecast percent changes.
  • D. The PLM layout has a single table to define and manage launch dates, and also enter any forecast adjustments.

Answer: B

Explanation:
The Product Lifecycle Management (PLM) layout consists of two tables: one to manage product launch and discontinuation dates and another to adjust forecasts accordingly. This structure supports managing the entire product lifecycle, as outlined in Oracle's documentation on PLM processes in supply chain planning


NEW QUESTION # 93
Which feature is NOT available for Sales and Operations Planning plans?

  • A. Load Planning Data from Files
  • B. Collect Planning Data
  • C. Configure Exceptions
  • D. View Segmentation Summary

Answer: C


NEW QUESTION # 94
When planning for customer demand to be fulfilled from internal organizations or from a contract manufacturer, what are the four types of planned orders that can be generated? (Choose four.)

  • A. Make orders for items being manufactured in the contract manufacturer organization.
  • B. Transfer orders for internally owned components being transferred from contract manufacturer to internal organizations.
  • C. Transfer orders for internally owned components being transferred from internal organizations to contract manufacturer organizations.
  • D. Return orders for items being manufactured in the contract manufacturer organization.
  • E. Buy orders for components purchased at internal organizations and contract manufacturer organizations.
  • F. Transfer orders for finished goods being transferred from contract manufacturer organizations to internal organizations.

Answer: A,C,E,F

Explanation:


NEW QUESTION # 95
Your buyers are very attentive in maintaining the approved supplier lists as needed. One of your planners regularly uses the portal to communicate with some of their key suppliers and has noticed that the publication process is taking a lot longer to complete because the business has grown. The planner is also complaining that the collaboration candidates' list is cluttered with items that are not yet required.
Which two steps should you take to address the planner's complaint?

  • A. Disable the decomposition and generate candidates' parameters in the Publish Order Forecast scheduled process.
  • B. Activate a Supply Chain Collaboration setting to ignore zero forecast combinations.
  • C. Activate a profile option called "Publish Order Forecast Using Sourcing Rules".
  • D. Activate the "Ignore for Supplier Collaboration" item attribute.

Answer: B,D

Explanation:
To improve performance and reduce unnecessary items in the collaboration candidates list, you can activate settings to ignore zero forecast combinations, which prevents items with no forecast from appearing in the candidates list. Additionally, activating the "Ignore for Supplier Collaboration" attribute for specific items ensures that these are excluded from supplier collaboration processes, streamlining the list to relevant items only. These options help in managing supply collaboration settings efficiently and are verified in Oracle documentation on Supply Chain Collaboration and Publish Order Forecast processes​
​
.


NEW QUESTION # 96
Your client uses product categories and global sourcing rules for supply planning. However, their newest product doesn't follow these rules. For a specific item in the category, it needs to be sourced from a different supplier globally.
How should they set this up for the easiest maintenance, going forward?

  • A. Create a new global sourcing rule for the item; remove the category level assignments and create new item level assignments for all items in the category pointing each to the correct global sourcing rule.
  • B. Create a new local sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
  • C. Create a new global sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
  • D. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; alter the category to be category-organization for the remainder of the products.
  • E. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; leave the category as is for the remainder of the products.

Answer: C


NEW QUESTION # 97
Your client wants their supply plans to have a customized group of exceptions. What two steps must you complete in order to make sure only these exceptions are included when running all of your client's supply plans? (Choose two.)

  • A. Manage Plans > Select each supply plan > Edit each supply plan > Add your exception set to Plan Options for each supply plan
  • B. Configure Exceptions > Expand Supply Planning Exceptions > Highlight lines with exceptions specified by client > Click 'Add to Exception Set'
  • C. Configure Exception Sets > Create exception set > Add exceptions specified by client
  • D. Select 'Add to Supply Plan' button > Select which supply plans you want to have this group of exceptions
  • E. Manage Plans > Select each supply plan > Edit each supply plan > Manually add each exception specified by client

Answer: A,C


NEW QUESTION # 98
Segmentation was last run many months ago and the replenishment planner is concerned about losing track of items whose policies get changed due to the upcoming resegmentation. There are also a lot of manually assigned segments that must be preserved. Which two approaches for Execute Segmentation should you use in this planner?

  • A. No other setting is needed.
  • B. Auto-approve segmentation changes should not be selected.
  • C. Save the last segmentation result should be selected.
  • D. Retain segment overrides should be selected.

Answer: C,D

Explanation:
To maintain manual overrides and track items through segmentation changes, select both "Save the last segmentation result" to archive the current segmentation configuration and "Retain segment overrides" to preserve manually assigned segments. These options prevent data loss during the resegmentation process​
.


NEW QUESTION # 99
You are defining material planners for your organization. However, when you go to Manage Material Planners, your organization does not appear in the list of values. Why?

  • A. The organization must be enabled in Manage Planning Profile Options.
  • B. The organization is an Item Organization.
  • C. The organization must be enabled in Manage Planning Parameters.
  • D. You do not have data access to the organization.
  • E. The organization was not enabled for collection under Manage Planning Source Systems.

Answer: E


NEW QUESTION # 100
......


Oracle 1z0-1066-24 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Configuring Planning Analytics: Here, supply chain consultants are assessed on their ability to configure planning analytics to generate actionable insights that enhance decision-making within the supply chain.
Topic 2
  • Using Supply Plans: This part measures the skills of supply chain planners in creating, duplicating, and managing supply plans. It involves setting up safety stock options, executing supply plans, and interpreting results.
Topic 3
  • Configuring Oracle Supply Chain Planning Cloud: This section evaluates the expertise of supply chain managers in setting up key functionalities within Oracle Supply Chain Planning Cloud. It covers configuring pages, tile sets, tables, and graphs, as well as managing planners, configuring security, and setting profile options, all while ensuring optimal use of Demand Management.
Topic 4
  • Using Demand Management: This segment assesses the competency of demand planners and supply chain analysts in configuring, running, and managing demand plans.
Topic 5
  • Managing Data Collection: This portion evaluates the skills of data analysts and supply chain planners in overseeing the data collection process within Oracle, ensuring accurate and timely data is collected for effective planning.
Topic 6
  • Evaluating Simulations: Supply chain planners are tested on their skills in evaluating and executing simulations, enabling them to predict outcomes and develop effective strategies under different supply chain conditions.
Topic 7
  • Managing Supply Network Model: Designed for supply chain managers and planners, this section assesses their ability to summarize attributes of the supply network model, manage sourcing and approved suppliers, apply item attributes for supply planning, and handle drop shipments. It also addresses planning for counter sales orders.
Topic 8
  • Managing Supply Chain Collaboration: This section measures the ability of supply chain collaboration managers to use Oracle tools for facilitating collaboration on supply planning, contract management, and customer demand management.
Topic 9
  • Managing Advanced Fulfillment: This part assesses the knowledge of logistics and fulfillment managers in managing complex fulfillment processes such as contract manufacturing, back-to-back fulfillment, and configure-to-order within the supply chain.
Topic 10
  • Configuring Attribute-based Planning: This part focuses on the ability of supply chain planners to set up and apply attribute-based planning, ensuring that supply plans are customized based on specific product or customer attributes.
Topic 11
  • Understanding Costing and Inventory: Aimed at supply chain managers, this part tests their knowledge of inventory and costing management within the Oracle Supply Chain, ensuring cost-effective and efficient inventory control.
Topic 12
  • Managing Replenishment Planning: Supply chain managers are assessed on their expertise in configuring replenishment planning, utilizing multi-dimensional demand segments, and balancing inventory through clustering techniques.
Topic 13
  • Managing Constraint-based Plans: Supply chain planners are assessed on their ability to develop and manage constraint-based supply plans that consider both material and resource constraints.
Topic 14
  • Using Sales and Operations Planning: This segment evaluates the skills of S&OP managers in configuring and integrating Sales and Operations Planning (S&OP) with Oracle SCM Cloud and external systems, aligning demand, supply, and financial objectives.
Topic 15
  • Configuring Exceptions: This section tests the expertise of supply chain managers in setting up and analyzing exceptions, ensuring they can identify and resolve issues within supply plans and demand forecasts.
Topic 16
  • Using Production Scheduling: Supply chain managers and planners are tested on their ability to configure and execute production scheduling to improve efficiency in production timelines and resource management.

 

1z0-1066-24  Certification Study Guide Pass 1z0-1066-24 Fast: https://www.exams4collection.com/1z0-1066-24-latest-braindumps.html

Free 1z0-1066-24 Certification Sample Questions with Online Practice Test: https://drive.google.com/open?id=1Rm9ZWsNP3yQi-iGDMbLTvOMFGOynItjO