
SAP C_TS422_2020 Dumps - 100% Cover Real Exam Questions (Updated 150 Questions)
Real C_TS422_2020 dumps - Real SAP dumps PDF
SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Introduction to SAP S/4HANA Production Planning | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Production Orders in SAP S/4HANA | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Lean Manufacturing in SAP S/4HANA | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Introduction to SAP S/4HANA Supply Chain Planning | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Advanced Planning in SAP S/4HANA | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Master Data in SAP S/4HANA | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Capacity Planning in SAP S/4HANA | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Demand Management in SAP S/4HANA | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
NEW QUESTION 12
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question.
- A. Scheduling margin key
- B. Production scheduling profile
- C. Confirmation profile
- D. Operation control key
Answer: B,D
NEW QUESTION 13
You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer.
- A. /SAPAPO/PPDS_DELTA_ORD_TRANS
- B. /SAPAPO/CREATE_LOCATION
- C. /SAPAPO/UPD_LOC_SP_PL
- D. /SAPAPO/CURTO_CREATE
Answer: A
NEW QUESTION 14
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
- A. The Individual/Collective indicator of the component
- B. The Planning Strategy of the finished product
- C. The item category of the component in the BOM
- D. The MRP Type of the component
Answer: A
NEW QUESTION 15
In the first step, you have created master recipes. In which sequence are the additional objects created?
- A. Process order Control recipe Process message PI sheet
- B. Control recipe Process order Process message PI sheet
- C. Process order Control recipe PI sheet Process message
- D. Control recipe Process order PI sheet Process message
Answer: C
NEW QUESTION 16
How would you define pegging in the context of Advanced Planning?
- A. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
- B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
- C. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
- D. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
Answer: A
NEW QUESTION 17
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question.
- A. Use a bucket-oriented capacity check
- B. Use DS heuristic "Schedule Sequence"
- C. Use optimization with respect to set-up times
- D. Use rescheduling with an alternative mode
- E. Use multilevel MRP run for the products on the resource
Answer: B,C,D
NEW QUESTION 18
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Control cycle
- B. Rate routing
- C. Production supply area
- D. Replenishment strategy
Answer: A
NEW QUESTION 19
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.
- A. Planned delivery time
- B. Setup time
- C. Float after production
- D. Total replenishment lead time
Answer: A,C
NEW QUESTION 20
What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer.
- A. Multid imensional Reporting client (MDRC)
- B. ABAP Managed Core Data Services (CDS)
- C. HANA Live
- D. Smart Business Cockpit
Answer: B
NEW QUESTION 21
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
- A. The requirements date occurs before that of a firmed planned receipt
- B. The requirements date occurs that of a firmed planned receipt
- C. The requirement no longer exists
- D. A firmed planned receipt cannot be rescheduled
Answer: A
NEW QUESTION 22
What determines whether the planned independent requirements in MRP consume other requirements?
- A. Order type
- B. Requirements profile
- C. Consumption sequence procedure
- D. Requirements type
Answer: D
NEW QUESTION 23
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To determine the work in progress along the production line
- B. To reduce the totalproduction lead time for along production line
- C. To stage different components for a production line simultaneously
- D. To provide timely updates of inventory management for the staged components
Answer: A,D
NEW QUESTION 24
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?
- A. Use a resource group.
- B. Use a heuristic.
- C. Use a propagation range.
- D. Use a planning group.
Answer: B
NEW QUESTION 25
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
There are 2 correct answers to this question.
- A. By usage probability
- B. 100% check
- C. First in first out (FIFO)
- D. Simultaneous
Answer: A,B
NEW QUESTION 26
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.
- A. Production version
- B. Material
- C. Plant
- D. Work center
Answer: B,D
NEW QUESTION 27
When do you use variant bills of materials (BOMB)?
- A. When multiple material also have the same BOM
- B. When a material has multiple BOMB
- C. When multiplematerial is have similar BOMB
- D. When a material has a configurable BOM
Answer: A
NEW QUESTION 28
You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.
- A. Actual cost calculation
- B. Order type determination
- C. Planning selection
- D. Master data selection
- E. Capacity requirements determination
Answer: B,D,E
NEW QUESTION 29
When do you use variant bills of materials (BOMs)?
- A. When multiple master also have the same BOM
- B. When multiple master also have similar BOMs
- C. When a material has multiple BOMs
- D. When a material has a configurable BOM
Answer: A
NEW QUESTION 30
What are properties of MRP Live? There are 2 correct answers to this question.
- A. The code is written in SQL Script
- B. Data is read sequentially from the database tables
- C. It uses the same BAdis as classic MRP
- D. It is executed on the database server
Answer: A,D
NEW QUESTION 31
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A. Change of the material'sprocurement type
- B. Creation of dependent requirements
- C. Change of the storage bin
- D. Creation of a sales order
- E. Creation of a purchasing contract
Answer: A,B,D
NEW QUESTION 32
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.
- A. Production Version
- B. Engineering Change Record
- C. Bill of Material
- D. Routing
Answer: A,C,D
NEW QUESTION 33
......
SAP S/4HANA Production Planning and Manufacturing Certification Exam Details:
| Sample Questions | SAP S/4HANA Production Planning and Manufacturing Certification Sample Questions |
| Exam Code | C_TS422_2020 |
| Passing Score | C_TS422_2020 - 56% C_TS422_1909 - 55% |
| Number of Questions | 80 |
| Reference Books | TS421, TS422 (SAP S/4HANA 2020) TS421 (SAP S/4HANA 1909), TS422 (SAP S/4HANA 1909) |
| Exam Price | $550 (USD) |
| Exam Name | SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing |
| Level | Associate |
| Schedule Exam | SAP Training |
Realistic Exams4Collection C_TS422_2020 Dumps PDF - 100% Passing Guarantee: https://www.exams4collection.com/C_TS422_2020-latest-braindumps.html
Free SAP C_TS422_2020 Exam Questions and Answer: https://drive.google.com/open?id=1PNXbUvDfUmTJDc2XBtUZgBjG1HXSCDGO
