NEW QUESTION # 17
As a NACE Level 2 Inspector on a field job; prior to submission your documentation should always reviewed and approved by:

  • A. Another NACE Level 2 Inspector
  • B. A NACE Level 3 Inspector
  • C. A NACE Level 1 Inspector
  • D. A NACE Protective Coating Specialist

Answer: B


NEW QUESTION # 18
Coating surveys may include which steps?
Select All That Apply:

  • A. Schedule the remedial work
  • B. Summarize the collected data
  • C. Evaluate the coatings performance
  • D. Develop a survey plan

Answer: A,B,C,D


NEW QUESTION # 19
When performing testing in accordance with ASTM D 2583 the inspector may observe:

  • A. Cold flow or creep
  • B. Cohesion failure
  • C. Adhesion failure
  • D. Glue failure

Answer: A


NEW QUESTION # 20
Coating application to concrete substrates is:

  • A. Not required as Concrete is inorganic
  • B. More challenging than coating steel
  • C. The same as coating steel
  • D. Less challenging, than coating steel

Answer: B


NEW QUESTION # 21
WJ-1 is always performed using UHWJ at pressures above 210 MPa (30,000 PSI)

  • A. True
  • B. False

Answer: A


NEW QUESTION # 22
You are the NACE Coating Inspector on a tank lining project and are asked to perform a high voltage holiday test after the coating applicators have completed their final repairs. After meeting all the confined space entry permit you enter the tank and notice a very strong odor of solvent.
Your first course of action should to:

  • A. Exit the tank and document the incident in your daily report
  • B. Exit the tank and immediately and report the problem to the nearest safety supervisor
  • C. Don your air supplied respirator and continue the testing
  • D. Investigate to find the source of the odor

Answer: B


NEW QUESTION # 23
You are the NACE Level 2 Coating Inspector where SSPC PA 2 has been specified with an additional requirement that no individual gauge reading shall be below a certain value.
As this is not part of the standard you should:

  • A. Ignore the additional requirement
  • B. Call your supervisor
  • C. Request clarification from the specifier
  • D. Enforce the additional requirement

Answer: D


NEW QUESTION # 24
Dehumidification is defined as the removal of moisture vapor from the air to

  • A. lower its dew point,
  • B. lower its temperature
  • C. provide worker comfort.
  • D. raise its relative humidity.

Answer: A


NEW QUESTION # 25
The solvent sensitivity/solvent wipe test (ASTM D4752) is used to determine the cure of

  • A. epoxies.
  • B. powder coatings.
  • C. urethanes.
  • D. inorganic zincs.

Answer: D


NEW QUESTION # 26
Because a NACE Level 2 Inspector has been trained in specific destructive tests, it is up to the Inspector to decide if and when a destructive test is required.

  • A. False
  • B. True

Answer: A


NEW QUESTION # 27
The cost of qualified Coating Inspection is normally offset by:

  • A. Lower Coating Life Cycle Costs
  • B. Lower Supervision Costs
  • C. Lower Safety Enforcement Costs
  • D. Lower Application Costs

Answer: A


NEW QUESTION # 28
The Inspectors' goal at the Pre-Job Conference is to:

  • A. Obtain a clear understanding of the Specification
  • B. Take accurate meeting minutes for distribution
  • C. Manage the meeting so it doesn't go off topic
  • D. Discuss contractual requirements

Answer: A


NEW QUESTION # 29
The HATE adhesion tester uses

  • A. compressed air to apply pressure to the test dolly.
  • B. a special tape to apply pressure to the test dolly.
  • C. mechanical means only to apply pressure to the test dolly.
  • D. a hydraulic piston to apply pressure to the test dolly.

Answer: D


NEW QUESTION # 30
Linings are used on the interior of pipelines to

  • A. provide protection against soil chemicals.
  • B. protect the transported product.
  • C. afford limited temperature insulation.
  • D. reduce magnetic polarity.

Answer: B


NEW QUESTION # 31
Coating Surveys are legally required:

  • A. On high pressure gas lines and fireproofed structures
  • B. On food and beverage vessels and can linings
  • C. On commercial marine vessels and offshore platforms
  • D. On water tanks and potable water pipelines

Answer: C


NEW QUESTION # 32
When ASIN D 3363 is specified the Inspector must:

  • A. Record the two end points identified in the standard
  • B. Record the highest value attained
  • C. Use the correct solvent
  • D. Record the percentage of failure

Answer: A


NEW QUESTION # 33
Inspection and Test plans are developed by referencing:

  • A. The Specification, SDS, relevant Standards and Codes
  • B. The Specification, Safety Manual, Relevant Standards and Codes
  • C. The Specification, TDS, relevant Standards and Codes
  • D. The Specification, Application Guidelines, 'Relevant Standards and Codes

Answer: C


NEW QUESTION # 34
......

Pass NACE-CIP2-001 Exam - Real Questions and Answers: https://www.exams4collection.com/NACE-CIP2-001-latest-braindumps.html

Pass NACE-CIP2-001 Review Guide, Reliable NACE-CIP2-001 Test Engine: https://drive.google.com/open?id=1MACUciwN9wZpVeLn4JWHsi4w0Drdtv-g